Adani Green Energy Limited (AGEL) has awarded a ₹1,050 crore Balance of System (BOS) contract to Bondada Engineering Limited for the 650 MW Khavda Mega Solar Project in Gujarat. Part of the Khavda Renewable Energy Park — spanning 538 sq km, nearly five times the size of Paris — the project is set to become the world’s largest renewable energy facility, generating 30 GW of clean power. The contract includes design, manufacturing, procurement, quality checks, and delivery of the BOS at the site. Adani Group’s massive investment of ₹1.5 lakh crore in Khavda and a total of ₹12.3 lakh crore in renewable energy by 2030 underlines its commitment to sustainable growth, energy independence, and driving India’s clean energy revolution.